Commit Graph
2 Commits
Author SHA1 Message Date
protonmatter a1c6103cbf Stop admitting work before the drain and replay each outbox row once.
The listener closes before Wait, and a shutdown refuses new task operations. Wait also stays until detached runs finish. The activity insert and the outbox delete commit together, and a row that keeps failing is dropped after five attempts so it cannot block the rest.
2026-11-17 15:41:56 -05:00
protonmatter 0234025d28 Drain task goroutines on shutdown and replay activities that could not be stored.
The outbox migration is 0006 because 0005 is already traffic rewrite rules. A shutdown cancel leaves an in-flight intent claim running, so the next start can reset it to open instead of recording the interrupt as done or blocked.
2026-11-17 13:05:23 -05:00